Announcements
Pool Annual Maintenance
4-Lane Pool
Annual pool maintenance is scheduled for the 4-lane pool from Sunday, June 16 at 3 PM to Saturday, June 22. During this period, the 4-lane pool will be temporarily closed to ensure that necessary repairs, cleaning, and maintenance are carried out effectively.
While the 4-lane pool is closed for maintenance, the 8-lane pool will be open under a modified schedule to allow for lap swim, private swim lessons, and AquaEx classes.
8-Lane Pool
Annual pool maintenance is scheduled for the 8-lane pool from Friday, August 23 to Saturday, September 7. During this period, the 8-lane pool will be temporarily closed to ensure that necessary repairs, cleaning, and maintenance are carried out effectively.
While the 8-lane pool is closed for maintenance, the 4-lane pool will be open under a modified schedule to allow for lap swim.
The purpose of this routine maintenance is to enhance the overall safety, cleanliness, and functionality of our pool facility, providing you with an optimal swimming experience throughout the year.